
360ton Stator from Poland to Matla Power Station, South Africa
Vanguard has successfully completed the end to end transport and installation of a 360ton stator, from Poland, to Matla Power Station in South Africa
Vanguard owns and maintains the largest fleet of heavy lift equipment in the southern hemisphere including stand jacks, hydraulic lift systems, self-climbing jacks and jack & slide.

Vanguard has successfully completed the end to end transport and installation of a 360ton stator, from Poland, to Matla Power Station in South Africa

Vanguard have completed the specialised transportation of 25 wind turbines approximately 550km to the Ummbila Wind Farm Project.

Vanguard complete the shipping, transport, installation and commissioning of a Yadon tandem press line at the ISUZU production site in Port Elizabeth.

Vanguard have completed the complex transportation of a 50m long, 171t cold box, approximately 2,700km from Namibia to Zambia.

Vanguard overcome extreme weather conditions to relocate the SAS Assegaai

Vanguard have demonstrated their engineering prowess by designing a transport solution suitable for the longest wind turbine blades in South Africa.
Vanguard were required to battle extreme weather conditions to successfully complete the relocation of a 650t ex South African Navy submarine.
The SAS Assegaai, which was decommissioned in 2003, was required to be transported 1.5km from the Navy Dockyard to the new Naval Heritage Site in Simons Town.